The Parking Lot Improvement project include the repair of 10 main campus lots. The repairs varied from sealing and restriping to full depth milling and resurfacing. Some lots required grade adjustments and drainage structure improvements. Completing the project by the fall semester was imperative. DGL provided GPS survey services on a compressed schedule of all lots. A three-dimensional base map was provided for each parking lot. The compressed schedule and urgency to get the projects to bid required a flexible design and changes in design philosophy as the geotechnical data became available. DGL also provided on site construction administrative duties as well as office coordination and approvals for change orders, invoices, shop drawings and scheduling.