top of page
DGL provided construction administation and inspection services for this ODOT LPA project that was a 0.04-mile improvement to Bays Road over the Middle Branch of the Portage River. The project consisted of complete replacement of the existing structure with a prestressed box beam bridge with an asphalt overlay on the deck. The abutments were constructed on drilled shafts. Approaches were reconstructed, channel protection was added, and the guardrail was replaced. Minor storm drainage was also included.
Share This Project
Departments
Construction Management
bottom of page





.webp)

