top of page
This Ohio Turnpike and Infrastrucure Commission project (Ramp Bridge at MP 34.9, Liberty-Adrian Road Bridge at MP 41.1, and the Key Bridge at MP 60.8 over the Turnpike) included replacing the bridge decks and abutment slabs, deck joints and bearings, as well as installing fencing. Major work at the 34.9 structure included performing a micro-silica overlay and replacing bearings and joints. DGL also provided construction administration and quality inspection for the construction phase.
Share This Project
Departments
Construction Management
bottom of page





.webp)

