top of page
BGSU selected DGL to perform a boundary and topographic survey on a 50-acre parking lot. Topographic items included overhead and underground utility locations, drainage structures, parking lot, walkways and drive details, and surrounding roadway details.
BGSU redeveloped this site, bounded by SR 64, I-75, and campus recreational facilities on two sides, to enhance and beautify the eastern gateway to campus. Site boundaries were determined to assure new construction did not encroach upon ODOT right-of-way.
Share This Project
Departments
Survey
bottom of page







