DGL has been awarded a general services agreement with the City of Oregon since 2008. Tasks are primarily traffic in nature, but have included structural, roadway, right-of-way, and plan preparation assistance. Under the contract, DGL assisted with Navarre Avenue (I-280 to Isaac Streets Drive) Safety Study and Application ($2,300,000 awarded for improvements). We also reviewed four intersections for four-way stop traffic control; performed a Navarre Avenue/Wynn Road Left-Turn Phasing study; evaluated a new Toledo Refining Driveway on Wheeling Street; studied Coy Road from Navarre Avenue to Dustin Road to determine project limits for a TMACOG Transportation Improvement Project (TIP); designed Dustin Road and Isaac Streets Drive preliminary roundabout based upon available right-of-way and site constraints; reviewed a Super Load request on the Millard Avenue Bridge over the CSX Railroad; assisted with engineering and plan preparation for Otter Creek Road Reconstruction (an ARRA project); as well as easement descriptions for sidewalk installation at various locations. The most recent assignments included upgrading the signal at SR 51 (Woodville Road) and Pickle Road, a structural evaluation of the North Bridge at the Water Treatment Plant and curve evaluation for Munding Drive/Isaac Streets Drive, and an All-Way Stop Study at Starr Avenue/Lallendorf Road and Lallendorf Road/Pickle Road.
Share This Project
Departments
Traffic/Safety
Transportation - Roadway
Survey









