top of page
DGL 100 Year Logo White

Professional Engineering Services Task Order (2008 - present)

Corner.png
Corner.png

Client

City of Oregon

Location

Oregon, Ohio

Market

Local Government

DGL has been awarded a general services agreement with the City of Oregon since 2008. Tasks are primarily traffic in nature, but have included structural, roadway, right-of-way, and plan preparation assistance. Under the contract, DGL assisted with Navarre Avenue (I-280 to Isaac Streets Drive) Safety Study and Application ($2,300,000 awarded for improvements). We also reviewed four intersections for four-way stop traffic control; performed a Navarre Avenue/Wynn Road Left-Turn Phasing study; evaluated a new Toledo Refining Driveway on Wheeling Street; studied Coy Road from Navarre Avenue to Dustin Road to determine project limits for a TMACOG Transportation Improvement Project (TIP); designed Dustin Road and Isaac Streets Drive preliminary roundabout based upon available right-of-way and site constraints; reviewed a Super Load request on the Millard Avenue Bridge over the CSX Railroad; assisted with engineering and plan preparation for Otter Creek Road Reconstruction (an ARRA project); as well as easement descriptions for sidewalk installation at various locations. The most recent assignments included upgrading the signal at SR 51 (Woodville Road) and Pickle Road, a structural evaluation of the North Bridge at the Water Treatment Plant and curve evaluation for Munding Drive/Isaac Streets Drive, and an All-Way Stop Study at Starr Avenue/Lallendorf Road and Lallendorf Road/Pickle Road.


Share This Project
Departments

Traffic/Safety


Transportation - Roadway


Survey

Project Experience

Sylvania Downtown Improvements

Sylvania, Ohio

W117th RTA Rail Bridge

Cleveland, Ohio

First Energy Grafton Survey

Grafton, Ohio

State Route 303 Pedestrian Connectivity Program

Hudson, Ohio

bottom of page