Terra State Community College recognized that the pavement system across campus was nearing the end of its service life, had undergone routine maintenance, and included several areas requiring reconstruction. This project, scheduled for 2025 construction, is for the assessment and recommendations for reconstruction of campus driveways, alleys, parking lot/basketball court, and tennis/pickleball courts. The work includes a combination of mill and resurfacing with areas of full-depth reconstruction, along with associated drainage, curb, concrete apron, and walk repairs.
DGL was contracted to complete an existing conditions assessment and topographic survey of Main Drive, Parking Lots, and Alleys to review the pavement condition, curbs, drainage structures, and curb ramps. Following the survey of all existing conditions, a base map was created and a demolition plan for each area was created showing the limits of milling and/or areas of pavement removals for necessary full-depth reconstruction. A layout plan was prepared showing the locations of new pavements with dimensions as necessary for construction of the improvements.
Prior to final plans, DGL coordinated with a qualified geotechnical engineer for the completion of geotechnical and subsurface investigation services to complete soil borings/pavement cores to evaluate existing pavement build-ups and determine the properties of the underlying soils. DGL’s team will be providing services associated with bidding and construction administration services inclusive of weekly progress meetings, site visits, and project close-out documents.
Share This Project
Departments
Civil - Site
Transportation - Roadway
Survey