top of page
DGL 100 Year Logo White

Our Projects

3/4 view of a concrete multi-span bridge crossing a river.
Bonniebrook Road Bridge Replacement

Sylvania, Ohio

Safe Routes to School (SRTS)

various locations throughout Ohio

Temporary Drainage Structure near telephone/power lines.
Temporary Bridge Design / Construction Prep

Wood County, Ohio

Fresh asphalt has been applied to a road that runs through a subdivision. There are houses on each side of the road.
Shawnee and Wildflower Full Depth Reclamation

Metamora, Ohio

Multi-level building that is an operating room at a hospital.
St. Luke’s Operating Room and Electrophysiology Lab

Maumee, Ohio

Traffic bridge running over a river.
UToledo David Leigh Root Bridge Replacement

Toledo, Ohio

Highway widening project mid-construction with vehicular traffic passing
I-75 Widening

Wood and Hancock Counties

Plan view of facility expansion roof framing plan
Toledo Electrical Joint Apprenticeship Training Committee Office Expansion

Rossford, Ohio

Redirock marina active construction site overlooking Lake Erie with adjacent housing.
Compass Rose Seawall Repair

Vermillion, Ohio

Pedestrian trail made of asphalt made with used rubber tires. The trail goes through a heavily wooded area.
Pearson Metropark Scrap Tire Resurfacing

Toledo, Ohio

New asphalt road and seeded ditch.
First Solar / Tracy Road Roadway Improvement Project

Wood County, Ohio

Multi-Use bike Path (MUP) running perpendicular to railroad tracks. There are painted traffic marking
Roachton Road Multi-Use Path

Perrysburg, Ohio

Searching For Specific 
Experience?

Surveyor in kayak inspecting the bridge in project scope above.
bottom of page