top of page
DGL 100 Year Logo White

Our Projects

Empty 4 Way Intersection with newly paved asphalt and red brick pattern stamped pedestrian crossings
East Perry Street Reconstruction

Tiffin, Ohio

Aerial photo of boulevard with adjacent sidewalks.
Levis Commons - Michael Owens Way

Perrysburg, Ohio

Parking lot after reconstruction. There are freshly painted parking spots.
UToledo Parking Lot 2 Reconstruction

Toledo, Ohio

On-Campus privatized student housing building. it is multi-level. There is landscaping in the front of the building.
On-Campus Privatized Student Housing, BGSU

Bowling Green, Ohio

Covered bridge with a triangular roof. There is a sign on the bridge that says "Sleepy Hollow". There are trees on either side of the bridge.
Sleepy Hollow Covered Bridge Replacement

Sylvania, Ohio

Newly paved asphalt multi-use path and park signage between the adjacent roadway trees.
Fremont Multi-Use Path/Bike Lane

Fremont, Ohio

Traffic light at a three-way intersection.
Professional Engineering Services Task Order (2008 - present)

Oregon, Ohio

Top-down aerial image of a cul-de-sac style residential development under construction.
Fallen Timbers Fairways Subdivision - Plat 7

Maumee, Ohio

Asphalt road with painted traffic markings. There are parking lots on either side.
Ridge/Willard Roadway Lighting

Bowling Green, Ohio

Anthony Wayne High School Sign adjacent to the parking lot entrance
Anthony Wayne Schools

Whitehouse, Ohio

Roadway and concrete sidewalks lead to trees and large brick facility.
Greenfield Street Improvements

Tiffin, Ohio

Traffic signals at a four-way intersection. The traffic lights are green. There is traffic on the road.
Secor Village Traffic Impact Study

Toledo, Ohio

Searching For Specific 
Experience?

Surveyor in kayak inspecting the bridge in project scope above.
bottom of page